Edgewood Road Improvements and Flood Risk Management Project

Project Overview

The flood mitigation portion of this project is being developed as a potential improvement to be included with the reconstruction of Golf Course Avenue. The flood mitigation component was authorized by the City Commission on May 23, 2016 as part of the prioritized comprehensive flood control plan, with funding coming by way of flood control sales tax revenue. Houston Engineering has been hired to plan and design the project.

Links to the presentation (PDF and PowerPoint) given at the December 6, 2016 public meeting, as well as a comment sheet and layout options, can be found in the Resources section located in the right margin of this page.

Construction Timeline

Construction could commence as early as the fall of 2017, with the majority of the road and flood mitigation construction taking place in 2018.