The Special Assessment Commission (SAC) ride and review will take place on Thursday, August 24 at 8:30 am. The ride involves physically reviewing the field of projects within the district area created. Those in attendance will include the Special Assessment Commissioners and special assessment staff. The Special Assessment Commission review (discussion on the benefits of the various projects) will be held in Engineering Conference Room E250 immediately following the SAC Ride. The Special Assessment Commission Hearing will take place on Tuesday, August 29 at 9 a.m. in the City Commission Chambers within Fargo City Hall (225 4th St N).
The list of projects is as follows:
Project # Description Location
AN-21-A Alley Paving Between 10th & 11th Streets from NP Av to 1st Ave
BN-20-A Water Main, Storm, Paving, Traffic Signals, Shared Use Path University Dr N from 32nd Ave. N. to 40th Ave. N.
BN-21-A Bridge, Utilities, Paving Shared use Path & Structure 64th Ave. S. from 33rd to 38th St. S.
BN-21-B New Paving and Utility Construction Madelyn Meadows
BN-21-E New Paving and Utility Construction Valley View Estates 2nd
BN-21-H New Paving and Utility Construction EOLA Addition
BN-21-L New Paving and Utility Construction Vet's Blvd. between 52 & 53 Ave. S.
BN-22-A New Paving and Utility Construction 64th Ave. S. & 45th St. S.
BN-22-B New Paving and Utility Construction Meadow View Addition
BN-22-J New Paving and Utility Construction Golden Valley 6th-67th Ave. S. & 27th St. S.
BN-22-K New Paving and Utility Construction Crossroads Corporate Center Addition
BN-22-N New Paving and Utility Construction 63rd Ave. S. between 18th S. S. & 21st St. S.
BR-21-C Water Main Replace, Storm, Street Recon 21st Ave. S. from Gold Dr to East side of 15 St. S.
BR-21-E Paving & Utility Rehab/Reconstruction 11 St. N. from NP Ave to 1 St. N.
BR-22-F Paving & Utility Rehab/Reconstruction 21st St S from 9-13th Ave. S.
FM-20-C Drain Improvements Drain #53 Lowering and Widening with Levee - SE Cass
FP-19-A Southwest Regional Pond Phase 1 South of 52nd Ave. S. between 45th and 57th St. S.
NR-20-A Storm Sewer Lift Station Replacement Lift Station #6, #8, #49 assessed
PN-22-A Asphalt Wear Course Six sections - two different memo letters
PN-23-C New Paving 52nd Ave between 45 & 47 Streets
PR-21-F Concrete Pavement Rehab 13th Ave. S. from 21-28 St. S. (arterial)
PR-22-C Concrete Paving Rehab/Reconstruction 13th Ave. S. from 28th St. S. to 38th St. S. (arterial)
PR-22-E Seal Coat Four sections assessed/six sections not assessed
PR-22-F Asphalt Mill & Overlay Seven sections
PR-22-G Asphalt Paving Rehab/Reconstruction 18th Ave. S. from 39-42 St. S. & on 40th St. S. from 17-19 Ave. S.
SL-21-B Street Lighting Three sections-Broadway to Elm, 27th Ave. N. to 32nd Ave. N.
SL-21-C Street Lighting Street Lighting 40th Ave N from I-29 to University Dr.
SR-22-A Sidewalk & Shared Use Path Rehab/Reconstruction Citywide
SR-22-B Sidewalk & Shared Use Path Rehab/Reconstruction Citywide
TN-22-A Traffic Signal Improvements Hawk Signals at two locations