Menu

City News Room

Winter Header

Special Assessment Commission Ride, Review and Hearing Schedules

he Special Assessment Commission (SAC) ride and review will take place on Thursday, August 20 at 8:30 am. The ride involves physically reviewing the field of projects within the district area created. Those

08/12/2020 3:00 p.m.

The Special Assessment Commission (SAC) ride and review will take place on Thursday, August 20 at 8:30 am. The ride involves physically reviewing the field of projects within the district area created. Those in attendance will include the Special Assessment Commissioners and special assessment staff. The Special Assessment Commission review (discussion on the benefits of the various projects) will be held in Engineering Conference Room E258 immediately following the SAC Ride. The Special Assessment Commission Hearing will take place on Wednesday, September 2 at 9 a.m. in the City Commission Chambers within Fargo City Hall (225 4th St N).

The list of projects is as follows:

AN-19-G PC Concrete Alley Paving Roberts Alley from 1-2 Ave N
BN-17-B San, WM, Storm, Grading, Pave, St Lights 19th Ave N/57 St to I 29-Arterial
BN-18-F San, WM, Storm, C/G, Paving, Grading Madelyn's Meadows
BN-19-A Paving, Storm, St Light, Signals, Shared Use Path, Sidewalk, Bridge, WM 52nd Av Arterial
BN-19-B San, WM, Storm, Paving, Street Lights Grayland Addition Phase II
BN-19-C San, WM, Storm, Grading, C/G, Asphalt Paving Golden Valley 2nd
BN-19-E San, WM, Storm, Paving, Street Lights Bison Meadows
BN-19-F San, WM, Storm, Grading, C/G, Asphalt Paving Eagle Valley 3
BN-19-J San, WM, Storm, Paving, Street Lights Fitzsimonds
BR-18-A Paving, Storm, San, WM, SW,SL, Signals Main Av from 2nd to Broadway (DOT)
BR-18-B Paving, Storm, WM, San Lift, SW, signals 10th St N from 4-12 Av's (DOT)
BR-18-F WM Replacement, Street Recon Roberts Street
BR-18-G WM Replacement, Street Recon 4 St S from 6 Av-2 St & on 6 Av from 4 St to 250' W
DN-18-A Drain Improvements Grayland/Drain 27 AREA
FM-14-84 Flood Mitigation, Street Recon 2nd St S
FM-17-C Levee & Pond Project Bison Meadows Addition
NN-15-B Storm Lift station, retention & trunk storm Commerce on 12th
NN-17-A Storm Lift Station, Retention Pond Laverne's Addition
NN-18-A Storm Sewer Lift Station Drain 27 area
NR-17-B Broadway Interceptor Wet Weather Improve Lift Station #1
NR-18-A Storm Sewer Lift Station Modifications #21 & #54
PN-18-B Concrete Paving, C/G, Asphalt Paving 23 Av S/41st St area
PN-18-C Concrete Paving Laverne's Addition
PR-19-E Seal coat Sec 11,12 & 14 Assessed
PR-19-F Mill & Overlay 8 sections
PR-19-G Mill & Overlay 2 sections
SL-17-B Street Lighting & Incidentals Between 13th Av S/I-94 & University Dr/21 St S
SL-19-B Street Lighting & Incidentals 19 to 29 Avs N between Broadway & Evergreen
SL-19-E Street Lighting 7 & 8 St N from 15-17 Av
SN-19-A New Construction of City Order Sidewalks New Sidewalks
SR-19-A Reconstruction of City Order Sidewalks Recon Sidewalks
TN-19-A Traffic Signal Improvements University Dr & 17 Av N
UN-18-C San, WM, Storm Laverne's Addition