Red River Shared Use Path (15th Ave N to Woodcrest Dr)


Zone: NorthWhat zone am I?

Future

Start: Spring 2026

Estimated Completion: Fall 2026

Current Status:

This project is currently scheduled to be constructed in 2026.


Overall Project Map:


SN-25-B0_OverallMap
SN-25-B0_OverallMap

Overall Project Map


Project Overview:

This project will construct a 10' wide off-road shared use path that from 15th Avenue North to the South Woodcrest Drive North Cul-de-sac.


Impacts:

The project will require excavation and embankment along the path to tie into the existing ground. Tree removals are not anticipated, but may occur in areas that conflict with proposed construction.


Contractor:

To Be Determined


Timeline:

The project is tentatively scheduled to be built between spring and fall of 2026.


Funding:

This project will be funded with Federal and local money.


Purpose:

This path will expand Fargo’s pedestrian and cycling infrastructure by providing users with a scenic connection along the Red River from 15th Avenue North to South Woodcrest Drive North. The path will accommodate different types of commuting including walking, jogging, and biking.