19th Ave S (42nd St S to 38th St S), 38th St S (19th Ave S to 17th Ave S), & 40th St S (20th St S to 19th St S) Improvements


Zone: SouthWhat zone am I?

Future

Start: Spring 2024

Estimated Completion: Fall 2024

Current Status:

This project is currently scheduled to be bid in spring of 2024.


Overall Project Map:


PR-24-H1_OverallMap

Overall Project Map


PR-24-H1_PhasingMap

Phasing Map


Project Overview:

Update the following info as needed with project specific details:
Construction activities include the removal and replacement of the existing asphalt pavement, concrete curb and gutter, sidewalks, and driveway aprons.


Impacts:

This project will be constructed in phases to minimize local impacts as much as possible.


Contractor:

To Be Determined


Timeline:

It is anticipated that construction will begin in the spring of 2024 with all roads reopened in the fall of 2024.


Funding:

The project will be funded by a combination of City Funds (Infrastructure Sales Tax) and Special Assessments to the benefiting properties. Special Assessments will be applied per City policy.


Purpose:

The street reconstruction is necessary because the existing street section has deteriorated significantly and has exceeded its life expectancy.


Public Meeting Video (Date, 2024):

Public Meeting video will be added below via Video Embed once the meeting takes place.