Menu

City News Room

Winter Header

Special Assessment Commission Ride, Review and Hearing Schedules

The Special Assessment Commission (SAC) ride and review will take place on Wednesday, August 28 at 8 am. The ride involves

08/20/2019

The Special Assessment Commission (SAC) ride and review will take place on Wednesday, August 28 at 8 am. The ride involves physically reviewing the field of projects within the district area created. Those in attendance will include the Special Assessment Commissioners and special assessment staff. The Special Assessment Commission review (discussion on the benefits of the various projects) will be held in Engineering Conference Room E250 immediately following the SAC Ride. The Special Assessment Commission Hearing will take place on Thursday, September 19 at 9 a.m. in the City Commission Chambers within Fargo City Hall (225 4th St N).

The list of projects is as follows:
BN-17-A Sanitary, Water, Storm, Paving, Street Lights 19th Ave N from 45th to 57th St
BN-18-A Sanitary, Water, Storm, Paving, Street Lights Bison Meadows
BN-18-B Sanitary, Water, Storm, Paving, Street Lights Grayland 1st
BN-18-E Sanitary, Water, Storm, Paving, Street Lights Border States Electric
BN-18-G Sanitary, Water, Storm, Paving, Street Lights 33rd St N
BN-18-J Sanitary, Water, Storm, Paving, Street Lights Rocking Horse 5th
BN-18-K Storm Sewer, Paving St Lights Northern Sheyenne/Fox First Addition
BN-18-L Sanitary, Water, Storm, Paving, Street Lights Urban Plains 3rd
BR-16-F WM Replacement, Street Recon-RAY G 28 & 29 St N, 8 Av, 10 Av, 11 Av N
BR-18-C Street Reconstruction 13th Ave S from 45th St to 57th St S
BR-18-E WM Replacement, Storm Replacement, Street Reconstruction Great Northern Dr
NR-17-A Storm Sewer Lift Station Modifications #9, #14, #16, #69
PR-17-B Street Reconstruction (DOT Project) University Dr S from 18th Ave St to I94
SN-16-B Bridge Mod's, Shared Use Path, SL-(DOT Project) 40 Ave Between Bridge @ Drain 27/18 St
SN-16-C Shared Use Path - Microsoft Area Microsoft/Cottagewood area
SN-18-B New & Reconstruction of City order Sidewalks Various Parcels Throughout the city
TN-16-F Traffic Signal Improvements 52nd Ave and Timber Parkway
TN-18-A Raised Pedestrian Crossing, Radius Improvements Northside Elementary (BCBS area)
UN-18-B Sanitary Sewer, Water Main, Storm Sewer 23rd Ave S and 41st St S