10th Street North Improvements (19th Ave to 28th Ave)


Zone: NorthWhat zone am I?

Future

Start: Spring 2020

Estimated Completion: Fall 2020

Overall Map

Overall Map


Current Status:

The project is currently in the design phase, with project bidding scheduled for late 2019 or early 2020.


Project Overview:

Construction activities include the removal and replacement of the existing water main, sanitary sewer repairs, upgrades to the storm sewer system, new asphalt pavement, new concrete curb and gutter, and new street lights.


Impacts:

The project will be constructed in phases to minimize local impacts as much as possible. However, through traffic on 10th Street North between 19th Avenue and 28th Avenue will be closed for the duration of the project.


Contractor:

To be determined.


Timeline:

Construction is expected to start in the spring of 2020 with completion scheduled for the fall of 2020.


Funding:

This project will be funded through a combination of Sales Tax Funds, Water Main Funds, Sanitary Sewer Funds, and Special Assessments.


Purpose:

  • The existing water main, installed 65 years ago, is Cast Iron Pipe (CIP) and prone to frequent breaks. Full replacement will significantly minimize impacts and costs associated with breaks.
  • The existing Vitrified Clay Pipe (VCP) sanitary sewer main, installed 65 years ago, will be repaired as needed and all service connections will be replaced at the main using modern materials and methods.
  • The existing asphalt roadway has exceeded its life expectancy, making street reconstruction necessary. The roadway reconstruction will include asphalt pavement with a gravel base, concrete curb and gutter, storm sewer inlets and leads, driveway approaches, street lights, and isolated sidewalk repairs.